Methodology overview
InfraSure uses a chain of models. A hazard model gives physical-damage losses. A revenue model gives a merchant revenue estimate. The InfraRisk Index combines these results with site constraints into one score. This page shows how the parts connect. Each model has its own page.
The model chain
| Model | Main outputs | Page |
|---|---|---|
| Physical-damage model | EAL, Hazard Loss, PML, Climate VaR | Physical-damage model |
| Revenue model | Risked Revenue, Revenue Risk | Revenue model |
| InfraRisk Index | Index score, benchmark percentile, red flags | InfraRisk Index and red flags |
| Future-climate adjustment | Future-climate Hazard Loss | Future-climate views |
What the models cover
| Area | Included |
|---|---|
| Geography | 13,085 quarter-degree cells across the continental US. |
| Benchmark assets | 100 MW solar plant; 100 MW wind farm with twenty 5 MW turbines. |
| Solar hazards | Hail, convective wind, hurricane, wildfire and flood. |
| Wind hazards | Convective wind and hurricane. |
| Revenue | P75 generation, historical local prices and adjustments. |
| Future climate | Hazard Loss under two emissions scenarios and three future horizons. |
| Portfolio VaR | Sum of individual asset P95 losses. |
All results start from a standard benchmark asset. See Benchmark and asset-specific results. For what the models do not cover, see Limitations.
Example asset
The methodology pages use one example asset where they can: a 240 MW solar plant in Texas.
| Result | Value |
|---|---|
| Asset value | $355.9M |
| Hazard Loss | 1.71% (about $6.1M EAL per year) |
| Climate VaR (P95) | $34.9M, of which hail causes $34.8M |
How each model page is organized
Each model page uses the same headings, so you can compare models:
| Heading | Answers |
|---|---|
| Purpose | What question does the model answer? |
| Inputs | Which data does it use? |
| Method | How does it calculate the result? |
| Outputs | Which metrics does it produce? |
| Assumptions | What does it take as given? |
| Limitations | What does it not do? |
| Validation | How was it checked? |
| Version | Which methodology version does the page describe? |
Methodology version
These pages describe methodology version 1.0, September 2026. Changes to the methodology are listed in What’s new.