Skip to main content

Default assumptions

InfraSure uses the defaults below until you replace them. Check which values are defaults before you use a result for a financing or insurance decision.

Benchmark assets​

ItemDefault
Solar benchmark asset100 MW solar plant.
Wind benchmark asset100 MW wind farm with twenty 5 MW turbines.
Grid13,085 quarter-degree cells across the continental US.
ScalingDollar results scale with capacity. A 240 MW plant scales the 100 MW benchmark by 2.4. Hazard Loss percentages do not change.

See Benchmark and asset-specific results and Limitations.

Insurance​

ItemDefault
Property policyA default property policy with limits set for a 200 MW plant.
Insurance Premium on the ProfileAn illustrative 100 MW benchmark premium, scaled to the asset’s capacity. It is not an insurer’s quotation.
PML return periods100, 200 or 500 years.

See Review damage and coverage.

Loan and operating costs​

ItemSolarWind
Tenor18 years15 years
DSCR covenant1.25x1.35x
Operating cost$23K per MW per year (NREL Annual Technology Baseline, 2024)—

See Test debt coverage.

Revenue​

ItemDefault
GenerationP75 annual output from 2012–2024 weather records.
Power price2010–2024 average wholesale price from nearby pricing nodes.
CurtailmentA reduction based on the frequency of negative-price hours in 2025.
Market valueBerkeley Lab regional solar and wind factors.
Contracted energyNone until you enter a PPA price on the Profile.

See Revenue model.

Climate and risk scoring​

ItemDefault
Climate scenariosSSP2-4.5 and SSP5-8.5.
Future horizons2030, 2050 and 2100.
Risk profilesEarly-Stage Developer, Late-Stage De-Risked, Revenue-First and Hazard-First, or Custom weights.
Benchmark cohortContinental US or ISO Region.

See Future-climate views and InfraRisk Index and red flags.